B. COLUMN REINFORCEMENT DETAILS

1. Table of contents 2
Pillar editor 4
OBSERVATION: 4
α) DIVORCE 7
CAMPSY 8
= 1, 00− 1, 30 X 8
= 1, 00 8
ADVERTISEMENT 8
b) BOX CONTROL 10
(c) COPYING-OPPOPULATION OF EQUIPMENT 12
USE: 12
d) REVISION 12
1. Geometry 13
2. Main armament 17
2.1 How the interventions on the rods are performed 17
2.1.1 To modify the diameter and type of the angle bars 17
2.1.2 To modify the number, diameter and type of bars in the side rail 18
2.1.3 To insert cheek bars when there are no cheek bars 19
OBSERVATION 19
2.1.4 To delete bars 20
2.1.5 To insert dimension lines 20
2.1.6 To exclude a rod from the Biaxial Bending test 22
2.1.7 To apply the modifications you make to all the same bars 22
2.1.8 New command for processing of horizontal and vertical trunk bars in walls 23
2.1.9 Corrosion 23
3. Connectors- Gratings 27
3.1 How the operations on the fasteners are performed: 28
To modify a connector 28
To insert a new connector 28
To delete a connector 28
OBSERVATION: 29
Horizontal wall frame reinforcement 29
OBSERVATION: (1) 30
OBSERVATION 33
Corrosion 34
4. Charts 36
5. Intensive 37
6. Results 37
7. Investigation 38
8. Deformations 38
9. Checks 39
OBSERVATIONS: 40
For the Recheck on Bend: 40
ATTENTION 40
For the Shear Recheck: 40
OBSERVATIONS: (1) 41
The procedure is as follows: 41
For the Recheck in Containment: 43
OBSERVATION: 44
OBSERVATION: (1) 44
Let's look at each case in detail: 45
EUROCODE 8-1 IMPORTANT REMARKS: 46
About the Circumference 50
PILLAR-WALL REINFORCEMENTS 51
10. Restoration 52
11. Cloaks 53
EXAMPLE: 54
OBSERVATION 55
OBSERVATION: 56
OBSERVATION (1) 56
Cloak projectiles on Pillars: 57
NOTE: 58
12. IOP-Creatures 61
• Steel Creatures: 62
OBSERVATIONS 62
• Strip data: 63
OBSERVATION 64
EXAMPLE 64
• Fibre-reinforced polymers (IOPs): 67
13. Protection 70
OBSERVATION: 71
14. Cage 72
GENERAL OBSERVATIONS: 75

RkJQdWJsaXNoZXIy NTIwNzc=