8B. ANALYSIS PART 2
CHAPTER 8B 'ANALYSIS' 36 The program calculated the new acceleration 0.36*0.60= 0.216 and in the return period and in the probability of exceedance it wrote the data of the specific seismic hazard category. In this example it is 30% and 135 years. Method m (for performance levels B & C) In the parameters I define the usual m calculation method (only for performance levels B & C) And returning to the initial parameters of the scenario in the field of the ground acceleration CAN.EPE. I see the value of the ground acceleration 0.216 as it was calculated previously and as it will be used in the scenario run to calculate the seismic action. Note also that the γi used for the calculation of the seismic
Made with FlippingBook
RkJQdWJsaXNoZXIy NTIwNzc=