8A. ANALYSIS Part 1: NEW BUILDINGS
CHAPTER 8A 'ANALYSIS' 28 They appear in the order: - The type of Intervention selected, the category of the building (if it is only Add, no adverse consequence option appears). - The data of the analysis scenario of the original study are then displayed, such as its name and the corresponding values of the quantities required. This is followed by the corresponding data of the current study (without a value in the Importance field because the Importance of the original building is always taken). - Finally, there follow the checks that relate to either intersection reasons, or to ground acceleration design reasons. Checks are made in each direction and it goes without saying that the criteria for exemption must be met in both horizontal directions. The final criterion is expressed on a case-by-case basis as a final ratio which, if greater than one, is not exempt and, if less than or equal to one, is exempt.
Made with FlippingBook
RkJQdWJsaXNoZXIy NTIwNzc=