13. OPTIMIZATION
CHAPTER 13 'OPTIMISATION' 7 1.2 Project parameters The next subsection deals with the project parameters and includes constraints imposed by the designer and the definition of material and production cost units. 1.2.1 Restrictions Using the ' General Restrictions ' command displays the following dialog box: where you can specify a minimum and a maximum material cost and the construction cost of your carrier, as well as a minimum and maximum limit for the eigenmodes of the first three eigenmodes.
Made with FlippingBook
RkJQdWJsaXNoZXIy NTIwNzc=