10D. DIMENSIONING PART 4/4

The 10th Module is called "DISCUSSION" and includes the following groups of commands: 3
1.1 Masonry Control 4
OBSERVATIONS: 4
1.2 New masonry building (EC6) 6
OBSERVATION: 7
OBSERVATIONS: 9
1.2.1 Control Simple 10
OBSERVATION: 10
1.2.2 Check 11
Interlayer masonry 11
Bending within level 12
1.2.3 Control Total 13
Show reasons for exhaustion with Color Gradation 17
⮚ New masonry building (EC6) 17
OBSERVATION: 21
2.1 Check 22
2.2 Control Total 23
Life Protection (B): 25
Quasi-Collapse (C): 25
2.2.1 Incorporation of the provisions of the CPR 26
OBSERVATION: 26
2.2.2 In-plane bending and shearing 26
2.2.3 Bending out of level 26
❖ For Performance Level A, checks in terms of forces 26
1.1 With an inactive area visa 27
1.2 With an inactive area visa 27
OBSERVATIONS 28
2. Parallel to the vertical joint / Perpendicular to the horizontal joint 30
2.2 With an inactive area visa 31
❖ Performance Levels B and C checks in terms of deformations OBSERVATION: 33
3.1 At the same time the vertical joint 34
3.2 At the same time in the horizontal joint 35
2.2.4 Masonry reinforcement 36
• With metal rods 36
2.2.5 Reinforcement with mantle 38
Masonry with concrete mantle - Remarks: 40
2.2.6 Reinforcement with Inorganic Matrix Fiber Mesh (IAM) 41
2.2.7 Reinforcement with metal rods 44
❖ EXAMPLE: 45
IMPORTANT OBSERVATION. 50
2.2.8 Strengthening with mass injections and deep grouting 54
• Reinforcement with deep grouting 56
Show reasons for depletion with Color Grading 58
OBSERVATIONS 58
3.1 Reinforcements - M.I.P. KADET - EC8-3 (Resilient) 66
3.2 Valuation of M.I.P. (CEDIT) 68

RkJQdWJsaXNoZXIy NTIwNzc=