10B. DIMENSIONING PART 2/4
CHAPTER 10B 'DIMENSIONING' 33 2.2 Resolution for the execution and the display of the results of the satisfactory. OBSERVATIONS: A prerequisite for both the selective and the overall node check is that the dimensioning of the beams has been done beforehand, as well as that " Iconic Zoom " is selected in the Beams- Pillars fields in the Dimensioning Parameters window. Satisfactory inspection should be carried out everywhere, where required, and should always precede the dimensioning of columns and walls.
Made with FlippingBook
RkJQdWJsaXNoZXIy NTIwNzc=