10B. DIMENSIONING PART 2/4

CHAPTER 10B 'DIMENSIONING' 31 2. Equity Control The "Satisfactory Check" field contains the commands to run and display the results of the satisfactory check. The satisfaction check is performed on a level-by- level basis. It should be done everywhere where required, and should always precede the dimensioning of the poles and walls. 2.1 Characterization to determine the support conditions of nodes, poles and walls. 2.1.1 Pillars With this command, you specify the support conditions of the poles for performing the satisfactory inspection. By selecting the command and after pointing to the node or nodes of the poles that you want to change the support conditions, you complete the selection by pressing the right mouse button and the following dialog box appears: In the first section there is a list of addresses where you select the address of the executable control and then from the next list the designation of the node to perform the satisfactory control. ATTENTION: • Note that the selection here only applies to the poles .

RkJQdWJsaXNoZXIy NTIwNzc=