10B. DIMENSIONING PART 2/4
CHAPTER 10B 'DIMENSIONING' 102 Show of chart interaction diagramat a distance x from the beginning of the opening (x=0m). The mandate is purely supplementary in nature and is not required for the process of valuation / subsidies. 5.3.1.1.1 Working course The process followed to evaluate and then enhance the section under consideration is as follows: 1. The Sizing Parameters are defined. 2. The intersection is solved. 3. We open the Valuation / Grants window for the section we are interested in. 4. In all openings we insert the longitudinal reinforcements of the existing slab. 5. We carry out the checks. 6. We examine the results of the audits by reading the issue. 7. If there is Sufficiency in all openings then the process ends. 8. If there is an opening with SURPLUS we have to introduce aid. 9. Select the type of aid. 10. We select materials and other data (e.g. missile properties). 11. In one or more openings we place the reinforcements. 12. We carry out the checks. 13. We examine the results of the audits by reading the issue. 14. If there is Sufficiency in all openings then the process ends. 15. If there is an opening with a DEFICIENCY repeat the procedure from step 9. 16. Below is a flow chart of the process of valuing the existing slab and introducing reinforcement.
Made with FlippingBook
RkJQdWJsaXNoZXIy NTIwNzc=