EXAMPLE 1. NEW BUILDING DESIGN FROM REINFORCED CONCRETE

EXAMPLE 1: 'REINFORCED CONCRETE CONSTRUCTION STUDY' 35 2.11 Connection of basement wall nodes - High stiffness beam member: The simulation of the basement walls through the "Beams in columns" command is completed with the connection of the column nodes at level 1 (at level 0 the connection has already been made by inserting the footings). Select the "Member" command and in the dialog box the button . The field is automatically populated with the inertial elements of a high stiffness and zero specific weight beam that simulates the high stiffness element required to connect the columns for the basement walls.