EXAMPLE 1. NEW BUILDING DESIGN FROM REINFORCED CONCRETE

EXAMPLE 1: 'REINFORCED CONCRETE CONSTRUCTION STUDY' 16 CONDITIONS: 1. Each floor plan to be used as an auxiliary file should be in a separate file that does not include any other drawings other than the floor plan with all its design entities. 2. The lines (lines and/or polylines) defining both the columns and beams and projections belong a single separate layer of their own. 3. The utility Archive is imported from at SCADA Pro environment in the active level XZ by identifying the origin of the axes with the upper left projection of all points of the plan . This means that any floor plan that is imported should be clear of random lines or other marks in the drawing's surroundings to avoid any displacements. To find the insertion point inside the drawing you can define the outlined rectangle of your drawing and you will know that its upper left corner will its insertion point inside the SCADA Pro environment. When inserting more height-independent auxiliary drawings, pay attention to the insertion point in order to achieve the correct height continuity of the floors. Plan view 1 (dwg) Plan view 1 (Scada)

RkJQdWJsaXNoZXIy NTIwNzc=